Every cost. Every markup. Published.
Below is the active partner's published cost table: equipment, labor, and permits. Your estimate is those costs plus 15%. The installer's identity and licenses appear only on your bid and consent.
The formula
Real cost, plus 15%. Nothing else.
price=real cost×1.15
What counts as cost
- EquipmentPanels, inverters, racking, wiring and monitoring, at the price on the supplier invoice.
- LaborCrew and electrician hours at a published, loaded hourly rate.
- Permits + interconnectionCity permit and utility interconnection fees, passed through at cost.
- Job-specific addersThings only your house needs, like a panel upgrade or trenching, at actual cost.
What is not in it
- Overhead padding
- Sales commissions
- Lead fees
- Dealer fees
- Advertising markups
None of these appear as a line on your receipt, and none are hidden inside another line.
Calculator
Move the slider. Watch every line.
Changes which incentives come off the bottom.
This runs the same pricing code as a real quote, against the published cost table. Your actual quote adds anything your roof specifically needs, at cost.
Oregon cost table
The numbers behind every quote.
Rows marked Estimated are excluded from final bids until an invoice is verified.
Equipment, pass-through fees and adders
| BOS-W | Estimated BOS, electrical, warranty reserve and project overhead | equipment · bos | $0.60per W | Estimated |
| MICRO-380VA | Estimated module-level microinverters | equipment · inverter | $174.00each | Estimated |
| MOD-430W | Estimated 430 W all-black solar modules | equipment · module | $141.90each | Estimated |
| MONITOR-JOB | Production monitoring and commissioning | equipment · monitoring | $325.00per job | — |
| RACK-W | Estimated roof attachments, rails and flashing | equipment · racking | $0.18per W | Estimated |
| DESIGN-JOB | System design and engineering | permit · design | $475.00per job | — |
| INTERCONNECT-JOB | Utility interconnection administration | permit · interconnection | $225.00per job | — |
| PERMIT-JOB | Building and electrical permits | permit | $650.00per job | — |
Loaded labor rates
Loaded means wages plus payroll taxes, workers’ comp and benefits. Hours scale with system size.
| Role | Rate | Hours |
|---|---|---|
| Electrical labor | $76per hr | 1.2/kW + 4 |
| Licensed installation labor | $58per hr | 5.5/kW + 8 |
Typical permit fees by city
Your receipt uses your city’s actual fee. Each published number links to the city’s fee schedule.
| City | Covers | Typical fee |
|---|---|---|
| Bend | Building + electrical | Est. |
| Eugene | Building + electrical | Est. |
| Medford | Building + electrical | Est. |
| Portland | Building + electrical | Est. |
| Salem | Building + electrical | Est. |
Version history
v2 is the first published table. When the partner publishes a new version, every changed cost will be listed here, old number next to new.
Compare
How that stacks up.
| Measure | Cost Plus Solar | Typical door-to-door | Lead-marketplace quote |
|---|---|---|---|
| Price per watt, before incentives | $2.56/W8 kW example from the live table (placeholder costs) | $4.70/WUS median, loan-financedLawrence Berkeley National Laboratory, 2024Pending re-verification | $2.43/WOregon average quoteEnergySage Oregon Solar Cost, October 2026Pending re-verification |
| Cost of finding you, inside your price | No commissions or lead fees. Overhead comes out of the 15%. | Sales commission, not disclosed on the quote. | $800–$1,500 per closed sale, typicalSolarReviews, 2026Pending re-verification |
| Financing dealer fees | None added. | Often built in. Median loan price is $4.70/W vs $3.50/W cash.Lawrence Berkeley National Laboratory, 2024Pending re-verification | Varies by installer. |
| Itemized real costs | Every line, with invoice references. | No. | No. |
| Markup disclosed | 15%, fixed. | No. | No. |
Door-to-door sales are usually financed, so the LBNL loan-financed median is the closest public benchmark. Benchmarks are national unless marked Oregon, and each links to its source. Last reviewed Oct 1, 2026.
Audit us
Don’t take our word for it.
Contractual audit rights
The lead-purchase agreement gives Cost Plus Solar the right to audit independent Oregon installation partner’s costs. If published costs do not match invoices, the table comes offline.
Invoices on request
Every line on your receipt carries an invoice reference. Ask, and you get the supplier invoice behind it.
Annual third-party review
Once a year an outside reviewer checks published costs against real invoices. The result gets published here.